Project Beaverbrook
A classic Etobicoke bungalow, reworked around how they actually live.

Project Type
Full Home Renovation
Location
Etobicoke, Canada
Service
Design-Build Renovation
Project Size
2,500 Sq Ft
Completion Year
2021
Duration
8 Months
Project Overview
The Beaverbrook property is a classic Etobicoke bungalow on a mature tree-lined street, the kind of post-war red brick home that defines its neighbourhood. The house had the footprint, the lot, and the character the client wanted to keep, but the interior layout, the roofline, and the finishes were all tied to the era it was originally built in.
The brief to Mignon was straightforward. The client wanted the house made nicer, a full reset of the interior to a current standard, with the exterior character of the home kept intact. Mignon took on the full design-build scope across 2,500 square feet, including structural work to the roof, new cathedral ceilings, a complete kitchen rebuild, and full bathroom renovations. Construction completed in 2021 on an 8 month programme.
Client Vision and Requirements
Transform a classic Etobicoke brick bungalow into a modern family home without losing its street character
- Keep the original red brick exterior and the home's place on the street intact
- Open the interior up with cathedral ceilings and better light
- Rebuild the kitchen to a premium European standard
- Renovate the bathrooms in a layered marble palette
- Deliver the full scope under one design-build contract with structural work included
Concept and Design Direction
The design direction is contemporary craftsman meets warm Scandinavian minimalism, with the client’s own collector pieces, vintage maps, antique models, pottery, books, Hudson’s Bay blankets, layered on top. The interior shell was deliberately kept calm, warm off-white walls, wide-plank light white oak floors throughout, clean modern trim, so the character of the home comes from what sits inside it rather than what’s painted on it.
All windows were replaced with larger black-framed units, and the entry, walkway, and landscaping were reworked to bring the arrival sequence up to the standard of the new interior.
Key Design Elements
Cathedral ceilings opened up through the main living volumes, pulling the house up into its roofline
- New cathedral ceilings in the kitchen volume, pitched to follow the gable roofline
- Wide-plank light white oak flooring carried through every room for a calm, consistent base
- Full matte dark grey European flat-panel kitchen cabinetry with white quartz counters and a waterfall island
- Oak floating shelves with integrated LED strip lighting flanking a polished stainless steel cylindrical range hood
- Full marble clad primary bathroom with a freestanding soaker tub and brushed brass fixtures
- Second bathroom finished in Carrara marble with a floating oak vanity and matte black fixtures
- Black steel arched four-poster canopy bed as the sculptural anchor of the primary bedroom
- Suspended black steel egg fireplace in the living room, hung as a feature off the main wall
- Industrial black steel and oak factory-style shelving unit, floor to ceiling with a sliding ladder
- New cedar shake gable, standing seam black metal roof, and large black-framed windows across the exterior
Structural Scope and Material Sourcing
The structural scope went well beyond a surface refit. The roof was rebuilt and new cathedral ceilings opened into the main living volumes, pitched to follow the new roofline. This changed the entire feel of the ground floor, pulling the house vertically where the original flat ceilings had kept it compressed. All window openings were enlarged and reframed to take new black-framed units, and a standing seam black metal roof replaced the original asphalt shingles above a new cedar shake accent gable.
Kitchen cabinetry was fully sourced from Portugal, selected for the finish consistency and the matte flat-panel detail the design called for. Marble for both bathrooms, flooring, fixtures, and the balance of the finish package were sourced locally within Canada.
Key Build Decisions
Full structural rework of the roof with new cathedral ceilings opened into the main living volumes
- Original red brick facade kept intact as the home's connection to the street
- New standing seam black metal roof installed with a cedar shake accent gable at the peak
- All windows replaced with larger black-framed units across the exterior
- European flat-panel kitchen cabinetry sourced from Portugal in matte dark grey
- Primary bathroom finished in full marble cladding with brushed brass fixtures
- Second bathroom finished in Carrara marble with a floating oak vanity and matte black fixtures
- Wide-plank light white oak flooring carried through every room
- Entry, walkway, driveway edge, and landscaping fully reworked
Design Challenges
Opening the roof up to create cathedral ceilings on an existing brick bungalow is not a cosmetic change. The existing roof structure had to be assessed, resized, and rebuilt around the new ceiling line, with the loads redistributed and the new standing seam roof detailed to work with the retained brick walls below. Enlarging the window openings in a load-bearing brick facade added another layer of structural work, with new headers and lintels designed into each new opening.
An 8 month programme for a 2,500 square foot full renovation with structural roof work, imported Portuguese cabinetry, two full marble bathrooms, and a complete finish refit is a tight run. Portuguese cabinetry lead times had to be built into the schedule from the start, with site readiness timed to the delivery window so the kitchen could install cleanly once it arrived. Canadian winter conditions added another scheduling layer around the roof and envelope work.
Solution
Mignon ran the project as a single design-build appointment, with the structural scope, the finish scope, and the imported cabinetry supply chain all coordinated under one contract. The roof rebuild and cathedral ceiling work were sequenced first to lock in the new volume before the finish trades moved in, with Portuguese cabinetry delivery timed to a prepared site. The project completed in 2021 on its 8 month handover, with Mignon’s single design-build contract covering the full scope from first structural assessment through to final key handover.
Client Feedback
“We loved the character of our old home, but the interiors needed a complete change. Mignon understood exactly what we wanted — a brighter, more open space without losing the charm of the house. The new ceilings, kitchen, and bathrooms made such a difference. It finally feels like a modern home that still feels like ours.”
After
Process
Planning a Villa Renovation
in Dubai?
Tell us about your villa, location, scope, budget range, and ideal timeline. Asad or a member of the Mignon team will reach out to understand the project and confirm whether we’re the right fit.













