Project Overview

The Bennet property sits in King City, one of the Greater Toronto Area’s most established residential enclaves. The original house on the plot was built in 1950 and had stood on the site for seventy-five years before the client approached Mignon. The structure had reached the end of its useful life, with the layout, systems, and finishes all tied to a mid-century build standard that no amount of renovation would bring up to the brief.

The decision was made to tear the existing house down in full and start over. The brief to Mignon was a complete new build on the same plot, designed in a traditional stone manor style befitting the street, and delivered under a single design-build contract from first drawing to key handover.

Construction is currently underway, with handover projected for March 2027 on a 10 month build programme.

Client Vision and Requirements

Replace a seventy-five year old 1950s house with a new build that reflects the standing of its King City address

  • Full tear-down of the existing 1950 structure to make way for a purpose-built new home
  • Traditional stone manor architectural language, in keeping with the character of King City's premium streets
  • A design that would hold its value and visual standing for decades, not years
  • Imported materials sourced from Europe and China for the finish level the client wanted
  • Full design-build delivery under one contract, from demolition through final handover

Concept and Design Direction

The architectural direction is a traditional European stone manor, built new. The facade combines natural stone cladding across the main volumes with smooth cream render on the recessed bays, a steep slate-grey hipped roof with multiple dormer gables, and tall arched feature windows set in black steel frames.

The front elevation is composed around a central arched entry portico, flanked symmetrically by stone gables on either side. A pair of arched double garages anchor the right side of the facade, finished in matte black to recede visually behind the stonework. A natural stone chimney rises from the roofline, reinforcing the manor character. The result is a home that reads as timeless rather than contemporary, which was a deliberate choice for the street and the plot.

Key Design Elements

A traditional stone manor facade designed to carry the character of King City’s established streets

  • Natural stone cladding across the main facade volumes, laid in a varied-coursed pattern for depth and texture
  • Smooth cream render on the central entry bay and secondary volumes as a counterpoint to the stone
  • Steep slate-grey hipped roof with multiple dormer gables as the dominant architectural signature
  • Tall arched feature windows on both floors, set in slim black steel frames for a crisp modern contrast
  • Central arched entry portico framing the front door, approached by a stone step
  • Twin arched double garages integrated into the facade, finished in matte black
  • Full-height natural stone chimney anchoring the right elevation
  • Landscaped front lawn with layered planting beds framing the base of the facade

Structural Scope and Material Sourcing

The project began with the complete demolition of the existing 1950 structure. A seventy-five year old building carries decades of hidden conditions, outdated systems, and unknown ground conditions beneath it, all of which had to be cleared and reassessed before any new foundation work could begin. New footings, slab, and full structural shell have all been built from scratch to current code.

Material sourcing has been coordinated across two continents to hit the finish specification the client wanted. Key materials have been shipped in from Europe and China, selected for the quality, consistency, and detailing that the stone manor facade and interior fit-out require.

Key Build Decisions

Full tear-down of the existing 1950 house, with the new build designed from scratch on cleared ground

  • Traditional European stone manor architectural language chosen over a contemporary scheme
  • Natural stone cladding selected as the primary facade material for longevity and street presence
  • Steep hipped slate roofline with dormer gables as the defining upper-storey feature
  • Arched window openings specified across both floors as a consistent design motif
  • Imported material supply chain built across Europe and China for the finish standard
  • Integrated twin garages worked into the facade composition rather than treated as a separate structure
  • Full design-build delivery under a single Mignon contract covering demolition through handover

Design Challenges

Tearing down and replacing a seventy-five year old home carries a specific set of risks that a straightforward new build on a clear plot does not. The 1950 structure had to be assessed for hazardous materials typical of its era before demolition could begin, and the site had to be fully cleared and reconditioned before any new foundations could be set. Ground conditions under a long-standing structure are rarely what the original drawings suggest, and the new footings had to be designed around what was actually found on site.

The 10 month build programme is tight for a full stone manor at this scale and specification, particularly with major finish and facade materials being coordinated from Europe and China into Canada on overlapping delivery windows. Winter conditions on a Canadian site add a further layer of scheduling discipline, with concrete, exterior stonework, and roofing all having to land in the right seasonal windows to keep the critical path intact.

Solution

Mignon took the project on as a full design-build appointment, handling demolition of the 1950 structure, site reconditioning, and the complete new build under one contract. International sourcing has been sequenced to keep site productive through each phase, with European and Chinese material lead times built into the programme from day one. The project is currently tracking to its March 2027 handover, with Mignon’s single design-build contract covering the complete scope from first demolition through final key handover.

CLIENT SUCCESS STORIES

★★★★★

We chose Mignon for the complete renovation of our villa in Palm Jumeirah, and the experience was very well managed from start to finish. Having one team handle the design, approvals and construction made the entire process much easier. The quality of the finishes and attention to detail were exactly what we expected for our home.

8 Years in Market
14 Realized Projects
AED 65M Estimated Projects Value

CLIENT SUCCESS STORIES

★★★★★

We wanted to modernize our villa while keeping the character and quality of the property. Mignon understood exactly what we were looking for and managed the renovation professionally from start to finish. The workmanship, material selection and overall execution exceeded our expectations.

8 Years in Market
14 Realized Projects
AED 65M Estimated Projects Value

CLIENT SUCCESS STORIES

★★★★★

Our villa needed a complete upgrade, and Mignon gave us a clear plan from the beginning. Having one point of responsibility for the design and construction made the entire renovation feel organized and straightforward. The final result is elegant, functional and exactly what we wanted for our family home.

8 Years in Market
14 Realized Projects
AED 65M Estimated Projects Value
01 / 03

Process

01

Reach out & initial call
You tell us about your property, your goals, and your budget. We ask the right questions to understand whether we are the right fit — for both sides.

02

Site visit & assessment
We visit your property in person. We review the existing structure, MEP systems, load-bearing walls, and anything else that affects what is realistically possible.

03

Design & layout planning
Our in-house designer develops the full interior layout options, material palette, joinery drawings, lighting, and MEP coordination. You review, we refine. Nothing moves forward until you are completely satisfied.

04

Scope, budget & contract
We prepare a detailed scope of work, itemized budget, and project timeline. One contract covers everything: design, permits, construction, and delivery.

05

Permits, drawings & sourcing
We prepare and submit all authority drawings for DM, Trakhees, or your community’s relevant authority. Simultaneously we source your materials, tiles, fixtures, and finishes so nothing is rushed or compromised once construction begins.

06

Construction begins
Demolition first, then structural works, then MEP (plumbing, electrical, HVAC) then walls, ceilings, and finishes. Our in-house team and vetted sub-contractors work in sequence. You receive weekly photo and video updates throughout.

07

Finishes & handover
All finishes installed: tiles, joinery, fixtures, stairs, and final details. We conduct a full snagging inspection before you enter. Every item is resolved. We hand over a home that is genuinely ready to live in.

Planning a Villa Renovation
in Dubai?

Tell us about your villa, location, scope, budget range, and ideal timeline. Asad or a member of the Mignon team will reach out to understand the project and confirm whether we’re the right fit.

Tell Us About Your Villa








    IDEAS COME TO LIFE
    WITH CONVERSATION.

    INFO@MIGNONBUILD.AE