Project Bennet
Seventy-five years rebuilt from the ground up.

Project Type
New Build (Full Tear-Down and Rebuild)
Location
King City, Canada
Service
Design-Build New Construction
Project Size
To be confirmed
Completion Year
2027 (March, projected)
Duration
10 Months
Project Overview
The Bennet property sits in King City, one of the Greater Toronto Area’s most established residential enclaves. The original house on the plot was built in 1950 and had stood on the site for seventy-five years before the client approached Mignon. The structure had reached the end of its useful life, with the layout, systems, and finishes all tied to a mid-century build standard that no amount of renovation would bring up to the brief.
The decision was made to tear the existing house down in full and start over. The brief to Mignon was a complete new build on the same plot, designed in a traditional stone manor style befitting the street, and delivered under a single design-build contract from first drawing to key handover.
Construction is currently underway, with handover projected for March 2027 on a 10 month build programme.
Client Vision and Requirements
Replace a seventy-five year old 1950s house with a new build that reflects the standing of its King City address
- Full tear-down of the existing 1950 structure to make way for a purpose-built new home
- Traditional stone manor architectural language, in keeping with the character of King City's premium streets
- A design that would hold its value and visual standing for decades, not years
- Imported materials sourced from Europe and China for the finish level the client wanted
- Full design-build delivery under one contract, from demolition through final handover
Concept and Design Direction
The architectural direction is a traditional European stone manor, built new. The facade combines natural stone cladding across the main volumes with smooth cream render on the recessed bays, a steep slate-grey hipped roof with multiple dormer gables, and tall arched feature windows set in black steel frames.
The front elevation is composed around a central arched entry portico, flanked symmetrically by stone gables on either side. A pair of arched double garages anchor the right side of the facade, finished in matte black to recede visually behind the stonework. A natural stone chimney rises from the roofline, reinforcing the manor character. The result is a home that reads as timeless rather than contemporary, which was a deliberate choice for the street and the plot.
Key Design Elements
A traditional stone manor facade designed to carry the character of King City’s established streets
- Natural stone cladding across the main facade volumes, laid in a varied-coursed pattern for depth and texture
- Smooth cream render on the central entry bay and secondary volumes as a counterpoint to the stone
- Steep slate-grey hipped roof with multiple dormer gables as the dominant architectural signature
- Tall arched feature windows on both floors, set in slim black steel frames for a crisp modern contrast
- Central arched entry portico framing the front door, approached by a stone step
- Twin arched double garages integrated into the facade, finished in matte black
- Full-height natural stone chimney anchoring the right elevation
- Landscaped front lawn with layered planting beds framing the base of the facade
Structural Scope and Material Sourcing
The project began with the complete demolition of the existing 1950 structure. A seventy-five year old building carries decades of hidden conditions, outdated systems, and unknown ground conditions beneath it, all of which had to be cleared and reassessed before any new foundation work could begin. New footings, slab, and full structural shell have all been built from scratch to current code.
Material sourcing has been coordinated across two continents to hit the finish specification the client wanted. Key materials have been shipped in from Europe and China, selected for the quality, consistency, and detailing that the stone manor facade and interior fit-out require.
Key Build Decisions
Full tear-down of the existing 1950 house, with the new build designed from scratch on cleared ground
- Traditional European stone manor architectural language chosen over a contemporary scheme
- Natural stone cladding selected as the primary facade material for longevity and street presence
- Steep hipped slate roofline with dormer gables as the defining upper-storey feature
- Arched window openings specified across both floors as a consistent design motif
- Imported material supply chain built across Europe and China for the finish standard
- Integrated twin garages worked into the facade composition rather than treated as a separate structure
- Full design-build delivery under a single Mignon contract covering demolition through handover
Design Challenges
Tearing down and replacing a seventy-five year old home carries a specific set of risks that a straightforward new build on a clear plot does not. The 1950 structure had to be assessed for hazardous materials typical of its era before demolition could begin, and the site had to be fully cleared and reconditioned before any new foundations could be set. Ground conditions under a long-standing structure are rarely what the original drawings suggest, and the new footings had to be designed around what was actually found on site.
The 10 month build programme is tight for a full stone manor at this scale and specification, particularly with major finish and facade materials being coordinated from Europe and China into Canada on overlapping delivery windows. Winter conditions on a Canadian site add a further layer of scheduling discipline, with concrete, exterior stonework, and roofing all having to land in the right seasonal windows to keep the critical path intact.
Solution
Mignon took the project on as a full design-build appointment, handling demolition of the 1950 structure, site reconditioning, and the complete new build under one contract. International sourcing has been sequenced to keep site productive through each phase, with European and Chinese material lead times built into the programme from day one. The project is currently tracking to its March 2027 handover, with Mignon’s single design-build contract covering the complete scope from first demolition through final key handover.
Client Feedback
To be added upon project completion in March 2027.