Project Palm
Fifteen years unchanged. One year to change everything.

Project Type
Villa Renovation
Location
Palm Jumeirah, Dubai
Service
Design-Build Renovation
Project Size
6,702 Sq Ft
Completion Year
2026
Duration
12 Months
Project Overview
The Palm Jumeirah villa was original Nakheel stock — handed over by the developer, lived in for fifteen years, and then rented out for the four or five that followed. No structural work had been done in that time. Some painting, some furniture. The bones of the property were unchanged from the day the client moved in.
The brief to Mignon was clear: the client wanted the villa to perform better as an investment — higher rental yield in the near term, a stronger resale position when the time came. A 6,702 square foot detached property on the Palm carries significant ceiling value. The renovation needed to close the gap between what it was and what it could command.
Construction is currently underway, with handover expected on 1st October 2026.
Client Vision and Requirements
Convert a dated, traditionally styled villa into a modern, market-ready property
- Resolve structural and functional deficiencies accumulated over fifteen years of use
- Improve the property's rental yield and long-term resale value
- Redesign the façade and entry to reflect the property's position on the Palm
- Maximise natural light and capitalise on the ocean view from the front of the home
Concept and Design Direction
The renovation addressed the property at every level: structure, services, façade, and interior. The traditional style that characterised the original Nakheel finish was replaced with a contemporary language — cleaner lines, better materials, more considered light. Asad oversaw the full scope, from the initial design sign-off through to the construction programme running to its October 2026 handover date.
Key Design Elements
A new two-storey front door designed as a single architectural statement for the façade, replacing the original entry
- Two separate garage doors consolidated into one large single door — resolving a long-standing functional frustration for the client
- Part of the front balcony removed to open the façade and strengthen the arrival sequence
- Existing windows redesigned to bring in more natural light and frame the ocean view visible from the front door
- Interior updated throughout from traditional to contemporary — finishes, fixtures, and detailing replaced in full
Structural Scope and Material Sourcing
The property had accumulated fifteen years of deferred maintenance alongside its cosmetic limitations. Mignon fixed the cracks in the structure, resolved active plumbing issues, and addressed the corroded pipework — the original pipes had turned visibly green over time and were replaced with new materials sourced from Spain. The full material palette was assembled across four countries.
Key Build Decisions
Structural crack repairs and remediation across the property
- Full plumbing overhaul: corroded pipework stripped and replaced with Spanish-sourced materials
- Spatial adjustments made to increase natural light penetration through the interior
- Tiles, finishes, and fixtures sourced from Hong Kong, United Kingdom, Germany, and Spain
- Façade redesigned: new two-storey front door, consolidated garage entry, reconfigured front balcony
Design Challenges
The renovation ran against a fixed twelve-month programme — tight but manageable. Regional instability in the Middle East introduced some uncertainty mid-construction, with the potential to disrupt supply chains and on-site scheduling. The project also had to maintain quality across materials being coordinated from four separate countries while hitting a firm handover date.
Solution
Mignon kept construction moving throughout. Supply chains were managed proactively, with sourcing across Hong Kong, the UK, Germany, and Spain sequenced to avoid site delays. The regional situation slowed certain decisions but did not materially impact the programme. The project is tracking to its 1st October 2026 handover date at a total project value of AED 3,000,000 — with Mignon’s single design-build contract covering the complete scope from first design drawing to key handover.
Client Feedback
To be added upon project completion — handover scheduled 1st November 2026.